Untitled Document
Like Eagle River History Gallery?

Eagle River Ontario and area Historical Image Gallery

Historic images, photos and other information from Eagle River, Ontario and Surrounding Areas

Image search results - " construction"
1955.jpg
Woodroom Framing 1955
BUILDING_HIGHWAY_N_W_O_.jpg
Highway Construction Northwestern Ontario
DECEMBER_1980_STOCK_TANKS_AND_FRAME_FOR_PULP_BALING.jpg
Building the New Mill in Dryden 1980Tanks in bleach plant and the frame for the pulp machine room going up. Big white blob in the background is the inflatable warehouse for pulp bale storage. Two large fans keep the tent erect.
DECEMBER_80_START_NEW_WOODROOM_AND_STUDMILL.jpg
Construction of Studmill and WoodroomDryden mill. December 1980.
DRYDEN_CIRCA_1952.jpg
Dryden Circa 1956
DRYDEN_MILL_MAY272C1981.jpg
Dryden's Great Lakes MillPapermill under construction. May 27, 1981
DRYDEN_SAFEWAY_LOT_JUNE62C1984.jpg
Dryden Safeway lotLooking east, June 6, 1984. Construction trailer just behind Ho-Ho restaurant.
Aligning two pictures for the stitch resulted in clipping the front of the truck.
FLAKT_PULP_DRYER_JUNE282C1981.jpg
Flakt Pulp Dryer under construction Dryden mill, June 28, 1981.
HIGHWAY_812_28NOW_50229_NOVEMBER52C1979.jpg
Highway 812 to Fort FrancesUnder construction, November 5, 1979. Now highway 502.
JANUARY_1981_PULPMACHINE_ROOM_FRAMED.jpg
Dryden Pulpmill, pulp machine bldg. framedJanuary 1981
Horizontal orange bar is the overhead crane
MARCH_132C_1996_CHIP_CONVEYING.jpg
Dryden Mill Chip Conveying System under constructionMarch 13, 1996
MAY_1980_REMOVING_ROCK_FOR_PULP_MILL.jpg
Removing Rock for Pulpmill May 1980Large white object is an air-inflatible warehouse for pulp bale storage. Inflated by large blowers. Fork trucks enter via a two-door room. Outside door closes before inside door opens to prevent deflation.
MAY_302C_1955_28129.jpg
Dryden Mill viewed from northMay 30, 1955
MAY_302C_1955_28329.jpg
Excavation for woodroom May 30, 1955
MAY_302C_1955_28429.jpg
Just west of the excavationMay 30, 1955
MAY_302C_1955_28629.jpg
Further west of the Woodroom excavationPossible camp for construction crew. May 30, 1955
NEW_PULPMILL_BUILD_JUNE82C1981.jpg
Dryden's New Pulpmill under constructionJune 8, 1981. Powerhouse at lower left fed by penstock from dam. Finishing room (old St. Regis bag factory) at right.
NOVEMBER_152C_1980_CAUSTICIZER_FRAMED.jpg
New Causticizer FramingDryden mill. November 15, 1980
24 files on 2 page(s) 1